  1. Conduct a hydro-geological survey.
  2. Apply for drilling authorizations from the mandated statutory agents, e.g., WRA.
  3. Carry out the borehole drilling exercise.
  4. Perform a 24-hour aquifer testing exercise to determine the borehole capacity.
  5. Design the optimal pump-set based on the test data from step 4.
  6. Install the pump and electrical hook-up (for solar pumps, refer to step 7).
  7. Solar installation and commissioning.